IBM C1000-132 (IBM Maximo Manage v8.0 Implementation) Certification Exam is designed for professionals who are responsible for implementing and configuring IBM Maximo Asset Management v8.0 solutions. IBM Maximo Manage v8.0 Implementation certification validates the skills and knowledge required to successfully deploy and maintain IBM Maximo solutions in a variety of environments. C1000-132 exam measures the candidate’s ability to install, configure, administer, and troubleshoot IBM Maximo solutions.
IBM Maximo Manage v8.0 Implementation certification exam is designed to test your knowledge and skills in implementing and configuring the Maximo Asset Management solution. IBM Maximo Manage v8.0 Implementation certification exam verifies your ability to plan, install, configure, troubleshoot, and administer the IBM Maximo Asset Management solution. It is an essential certification for professionals who want to demonstrate their expertise in Maximo Asset Management.
NEW QUESTION # 32
Which two records can be included as a contract line item on a Lease/Rental Contract?
- A. Non-Rotating item
- B. Asset
- C. Rotating item
- D. Non-Rotating Asset
- E. Tool
Answer: B,C
Explanation:
In IBM Maximo Manage, two records that can be included as a contract line item on a Lease/Rental Contract are a Rotating item and an Asset.
NEW QUESTION # 33
Which Maximo application can be used to generate replacement plans for assets?
- A. Maximo Health, Safety and Environmental (HSE)
- B. Maximo Health
- C. Maximo Manage
- D. Maximo Predict
Answer: B
Explanation:
The Maximo Health application can be used to generate replacement plans for assets.
NEW QUESTION # 34
In which three applications can Asset Depreciation be configured?
- A. Assets
- B. Tools
- C. Locations
- D. Item Master
- E. Chart of Accounts
- F. Asset Templates
Answer: A,C,F
Explanation:
Asset Depreciation can be configured in three applications in IBM Maximo Manage v8.0 according to IBM's documentation. These applications are:
Asset Templates
Assets
Locations
NEW QUESTION # 35
In the Budget Monitoring application, where are the budget amounts entered?
- A. Budget Line
- B. Budget Record
- C. Budget Rules
- D. Focal Point
Answer: A
Explanation:
the budget amounts in the Budget Monitoring application are entered at the Budget Line level. A Budget Line represents a specific account or category within a budget and allows for detailed tracking and analysis of budget data.
NEW QUESTION # 36
In the Work Order Tracking application, a Work Order is generated from a Preventive Maintenance (PM) record. How is the target finish date calculated?
- A. the Job Plan finish date
- B. the PM target finish date
- C. the Job Plan start date + the Job Plan duration
- D. the Work Order target start date + the Job Plan duration
Answer: D
Explanation:
In the Work Order Tracking application, when a Work Order is generated from a Preventive Maintenance (PM) record, the target finish date is calculated as the Work Order target start date + the Job Plan duration.
NEW QUESTION # 37
How many failure reports can be created for the same Work Order?
- A. just one failure report
- B. unlimited failure reports for either a work order or any of its tasks
- C. one failure report for the work order and only one for each task of the work order
- D. unlimited failure reports for each work order, but none for a task
Answer: C
Explanation:
In IBM Maximo Manage, you can create one failure report for a Work Order and only one for each task of the Work Order.
NEW QUESTION # 38
Which statement is true regarding Master Preventative Maintenance (PM) records?
- A. Associated PM records can only be created for a rotating item's location.
- B. Associated PM records can only be created for a rotating item's asset.
- C. Associated PM records are temporary and expire after 90 days.
- D. Associated PM records can be created for a Master PM which does not have an item
Answer: D
Explanation:
Regarding Master Preventative Maintenance (PM) records in IBM Maximo Manage, associated PM records can be created for a Master PM which does not have an item.
NEW QUESTION # 39
What is a core application in Maximo Manage?
- A. Permit to Work
- B. Graphical Scheduling
- C. Customer Billing
- D. Maintenance Version Control
Answer: A
Explanation:
The Permit to Work application is a core application in IBM Maximo Manage v8.0. This application allows users to manage work permits, ensure compliance with safety regulations, and ensure that work is authorized before it is started. Other core applications in Maximo Manage include Work Order Tracking, Asset Management, and Inventory Management.
NEW QUESTION # 40
What is a licensing method used to obtain the Maximo Asset Suite?
- A. Cloud based license
- B. User credits license
- C. Feature based license
- D. Monthly license
Answer: A
Explanation:
One licensing method used to obtain the Maximo Asset Suite is a Cloud based license.
NEW QUESTION # 41
What are the three default values used with the position of a Crew Type or Crew?
- A. Leader
- B. Driver
- C. Technician
- D. Supervisor
- E. Helper
- F. Apprentice
Answer: A,E,F
Explanation:
In IBM Maximo Manage v8.0 implementation, the three default values used with the position of a Crew Type or Crew are Helper, Leader, and Apprentice. These values represent the different roles that members of a crew can assume.
NEW QUESTION # 42
Select all that apply
What is the appropriate order of phases in order to create a workflow process?
Answer:
Explanation:
1 - Create the process
2 - Validate the process
3 - Enable the process
NEW QUESTION # 43
Which statement is true regarding Work Assets in the Safety Plans application?
- A. A Work Asset is either a Location or an Asset. A user needs to specify at least one of these for each record.
- B. A Work Asset is either an Asset, Asset Type, or a Location. A user does not need to specify Work Assets, as a Safety Plan can be applied without it.
- C. A Work Asset is either a Location or an Asset. A user does not need to specify Work Assets, as a Safety Plan can be applied without it.
- D. A Work Asset is either a Rotating Item, a Location, or an Asset. A user needs to specify at least one of these for each record.
Answer: A
Explanation:
In the Safety Plans application, a Work Asset is either a location or an asset that requires the safety plan. Each safety plan record must have at least one work asset specified, and the work asset can be a location or an asset.
NEW QUESTION # 44
Which two automation script launch points can be triggered directly by a workflow?
- A. Attribute - '
- B. Custom Condition
- C. Action
- D. Object
- E. Integration
Answer: B,C
Explanation:
two automation script launch points that can be triggered directly by a workflow are B. Custom Condition and D. Action. An action launch point associates a script with an action and executes when the specified action occurs1. A custom condition launch point associates a script with a condition and executes when the specified condition is evaluated2.
NEW QUESTION # 45
When creating a labor record, what must be associated with it?
- A. Person Record
- B. User Record
- C. Crew
- D. Supervisor
Answer: A
Explanation:
When you create a labor record in IBM Maximo Manage v8.0, you enable a person to report time against a work request1. Before you create a labor record, you must create a corresponding person record1. A person record is defined at the System level and when a person works across multiple organizations, they need multiple Labor records linked to the same Person record2.
NEW QUESTION # 46
Which limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type?
- A. Action Limit -
- B. Warning Limit
- C. Meter Limit
- D. Measurement Limit
Answer: A
Explanation:
In IBM Maximo Manage, the Action Limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type.
NEW QUESTION # 47
In the Receiving application, what are the three statuses that show the overall receipt status of the purchase order?
- A. NONE
- B. RETURNED
- C. PARTIAL
- D. WINSP
- E. VOID
- F. COMPLETE
Answer: A,C,F
Explanation:
In the Receiving application in IBM Maximo Manage, the three statuses that show the overall receipt status of the purchase order are COMPLETE, PARTIAL and NONE.
NEW QUESTION # 48
When creating a new Inspection form, a client requires a Work Order to be created if certain responses are recorded. Which two actions are required for this to be achieved?
- A. In the Question Options, set the Require action flag.
- B. Create an escalation on the QRESPONSE Object.
- C. In Form Settings add an Action Script.
- D. Make the question response interactive.
- E. Choose Work Order on question action.
Answer: A,E
Explanation:
According to the IBM documentation, you can create inspection forms that detail the questions and types of responses that you want to collect. The inspection forms that you create are then available to inspectors in the Conduct an Inspection tool. You can also add conditions to the response fields of existing questions on inspection forms to gather more information. You can determine which additional response fields appear to inspectors, depending on the answers they gave to inspection form questions.
To create a work order based on certain responses, you need to do two things:
Choose Work Order on question action: This option allows you to specify an action that is triggered when a certain response is selected by the inspector. For example, if a question asks "Is there any damage?", and the inspector selects "Yes", you can choose Work Order as the action that is triggered by this response. This will create a work order for repairing the damage.
In the Question Options, set the Require action flag: This option allows you to indicate that an action is required for a question. For example, if a question asks "Is there any damage?", and you set the Require action flag to Yes, then the inspector must select a response that triggers an action, such as Work Order or Notification. If they select a response that does not trigger an action, such as "No" or "N/A", they will see an error message and will not be able to submit the inspection form.
NEW QUESTION # 49
What are three available associations in the Hazards application?
- A. Safety Plans
- B. Hazardous Materials
- C. Material Safety Data Sheets (MSDS)
- D. Tag Outs
- E. Lock Outs
- F. Precautions
Answer: B,C,F
Explanation:
The Hazards application in IBM Maximo Manage v8.0 allows users to associate Material Safety Data Sheets (MSDS), Hazardous Materials, and Precautions with a particular hazard. These associations help in managing safety information related to hazards and in ensuring compliance with safety regulations.
NEW QUESTION # 50
What are the three default classes of a Ticket?
- A. Incident
- B. Release
- C. Service Request
- D. Problem
- E. Change
- F. Activity
Answer: A,C,D
Explanation:
The three default classes of a Ticket in IBM Maximo Manage are Problem, Service Request and Incident.
NEW QUESTION # 51
In the Organizations application, which action is used to create Inventory Usage documents for new reservations?
- A. Inventory Options
- B. Reservation Options
- C. Inventory Usage Options
- D. Work Order Options
Answer: B
Explanation:
In the Organizations application in IBM Maximo Manage, you should use Reservation Options to create Inventory Usage documents for new reservations.
NEW QUESTION # 52
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with which setting?
- A. Separate
- B. Discreet
- C. Autonomous
- D. Independent
Answer: D
Explanation:
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with the "Independent" setting. When a security group has the "Independent" setting, its authorization privileges are applied separately from any other security group that the user belongs to.
NEW QUESTION # 53
What is the default status in the Quick Reporting Application?
- A. DRAFT
- B. ENTERED
- C. APPR
- D. INPRG
Answer: A
Explanation:
The default status in the Quick Reporting Application in IBM Maximo Manage is DRAFT.
NEW QUESTION # 54
......
Achieving certification in IBM Maximo Manage v8.0 Implementation by passing the IBM C1000-132 exam is a valuable credential that demonstrates a professional's proficiency in asset management and their ability to implement and configure IBM's enterprise asset management software. IBM Maximo Manage v8.0 Implementation certification can open up new career opportunities and lead to higher salaries in the asset management industry.
Authentic Best resources for C1000-132 Online Practice Exam: https://examkiller.itexamreview.com/C1000-132-valid-exam-braindumps.html