C-TS413-2021 Certification Overview - [Mar 23, 2024] Latest C-TS413-2021 PDF Dumps [Q24-Q47]

Share

C-TS413-2021 Certification Overview - [Mar 23, 2024] Latest C-TS413-2021 PDF Dumps

The Best SAP C-TS413-2021 Study Guides and Dumps of 2024


SAP C-TS413-2021 certification exam is an excellent opportunity for professionals to validate their skills and knowledge in SAP S/4HANA Asset Management. Certified Application Associate - SAP S/4HANA Asset Management certification is globally recognized and highly valued in the industry, giving candidates a competitive edge in the job market. With the right preparation and practical experience, candidates can successfully pass the exam and earn the certification.

 

NEW QUESTION # 24
What is a valid partner type within the partner determinationprocedure?

  • A. Vendor (external)
  • B. Purchasing organization
  • C. Business partner (gen.
  • D. Purchasing group

Answer: C


NEW QUESTION # 25
What do you need to configure to enable entries in the action log ofan equipment?

  • A. Define an additional business view for the equipment category.
  • B. Activate the change documents for the equipment category.
  • C. Define the corresponding history-related field for the equipment reference category.
  • D. Select the time segment check box for the equipment category.

Answer: B


NEW QUESTION # 26
Which statements related to the creation of maintenance orders arecorrect? Note: There are 2 correct answers to this question.

  • A. The document within the document management system canbe assigned only at operational level.
  • B. The assignment of the header notification to an order CANNOTbe deleted.
  • C. When an order is created based on a single notification, this notification becomes the header notification.
  • D. The long text of the reference notification can be automatically copied as the long text of the order.

Answer: C,D


NEW QUESTION # 27
You cancel the technical completion of a work order. What are theeffects? Note: There are 2 correct answers to this question.

  • A. Open purchase orders are recompiled.
  • B. Open reservations are recompiled.
  • C. Open purchase requisitions are recompiled
  • D. Referenced notifications are put In Process again.

Answer: B,C


NEW QUESTION # 28
You want to create a new functional location. Which configurationsteps are required? Note: There are 2 correct answers to this question.

  • A. Define the reference functional location.
  • B. Define the functional location category.
  • C. Define the number range for the functional location category.
  • D. Define the structure indicator.

Answer: B,D


NEW QUESTION # 29
In which cases are projects (PS) used in the area of SAP S/4HANAAsset Management? Note: There are 2 correct answers to this question.

  • A. Condition-based maintenance
  • B. Investments
  • C. External refurbishment
  • D. Shutdowns and overhaul

Answer: B,D


NEW QUESTION # 30
You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in thesystem?

  • A. Scheduling indicator
  • B. Shift factor
  • C. Maintenance plan category
  • D. Maintenance package offset

Answer: D


NEW QUESTION # 31
What does a virtual data model provides

  • A. Ready to use business reports
  • B. Reporting tools for users
  • C. consumption ready views of data
  • D. A copy of the database optimized for analytical purpose

Answer: C


NEW QUESTION # 32
You create a revision for a maintenance event builder (MEB) scenario. Which of the following statements are correct? Note: Thereare 2 correct answers to this question.

  • A. You must use hierarchical task lists for the MEB scenario.
  • B. You can assign a hierarchical task list to the revision.
  • C. You can assign a network to a revision.
  • D. You must assign maintenance notifications to the revision.

Answer: B,D


NEW QUESTION # 33
What can be determined using the offset within a maintenancestrategy?

  • A. The first due date of a maintenance package
  • B. The call date for the maintenance order
  • C. The cycle duration
  • D. The start date of the maintenance order

Answer: A


NEW QUESTION # 34
You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question.

  • A. Edit classification data and characteristics.
  • B. Change a reference location.
  • C. Assign a subordinate piece of equipment.
  • D. Assign documents.
  • E. Create a measuring point.

Answer: A,D,E


NEW QUESTION # 35
A piece of equipment cannot be linked to a material. Determine whether this statement is true or false.

  • A. False
  • B. True

Answer: A


NEW QUESTION # 36
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question.

  • A. Via organizational unit and personal hourly rate
  • B. Via business partner and hourly price
  • C. Via activity type and hourly rate
  • D. Via cost center and activity type

Answer: C,D


NEW QUESTION # 37
You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.

  • A. Assign an inspection lot to the task list header.
  • B. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
  • C. Assign an inspection document as PRT to the task list operation.
  • D. Assign a piece of equipment with an allocated measuring point to a task list operation.

Answer: B,D


NEW QUESTION # 38
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question.

  • A. Reservations are created only after a material availability checkhas been performed.
  • B. For the combination of order type and planner group you can decide when reservations are created.
  • C. All open reservations are closed when the maintenance order isset to TECO.
  • D. Open reservations can be cleared when a maintenance order operation is finally confirmed.

Answer: C,D


NEW QUESTION # 39
Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct answersto this question.

  • A. Input estimated costs for repair malfunction.
  • B. Select and print the maintenance order shop papers.
  • C. Add a URL to provide further information.
  • D. View details of the technical object by navigating to the Asset Viewer.
  • E. Display the current location of the technical object.

Answer: C,D,E


NEW QUESTION # 40
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question.

  • A. In the report Material: Where-Used List
  • B. Within a maintenance order
  • C. In the material reservation list in inventory management
  • D. In the single-level list editing function for maintenance orders

Answer: A,B


NEW QUESTION # 41
Which of the following is a prerequisite for external refurbishment?

  • A. Select the material group for externally refurbished materials.
  • B. Activate the subcontracting indicator in an external activity.
  • C. Define the order type for external refurbishment.
  • D. Create the purchasing info record for the external provider.

Answer: B


NEW QUESTION # 42
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.

  • A. Change documents
  • B. Completion date
  • C. Call object
  • D. Maintenance activity type
  • E. Order type

Answer: B,C,E


NEW QUESTION # 43
You require stock material to carry out maintenance tasks. Whichof the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct answers to this question.

  • A. Material can be assigned at order operation level.
  • B. A goods receipt can be entered for a technically completed maintenance order.
  • C. Material can be assigned at order header level.
  • D. The pick list for materials can be printed before order release.
  • E. A control key for internal workforce is required when assigning stock material to an order operation.

Answer: A,B,E


NEW QUESTION # 44
What are the prerequisites to serialize a piece of equipment? Note:There are 3 correct answers to this question.

  • A. Add a serialized material to the equipment serial data view.
  • B. Assign a serial number profile to the equipment category.
  • C. Assign a serial number profile to the related material master.
  • D. Add a serialized material to the construction type field of the equipment master.
  • E. Maintain a serial number for an existing equipment master.

Answer: A,C,D


NEW QUESTION # 45
Which of the following statements are correct for SAP S/4HANACIoud - Asset Management? Note: There are 2 correct answers to this question.

  • A. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.
  • B. You do NOT have access to the SAP S/4HANA back end system.
  • C. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
  • D. You have access to the SAP S/4HANA back end system.

Answer: B,C


NEW QUESTION # 46
Which edition allows more extensive customer modifications?

  • A. On-premise edition
  • B. Cloud edition

Answer: A


NEW QUESTION # 47
......

Valid C-TS413-2021 Exam Updates - 2024 Study Guide: https://examkiller.itexamreview.com/C-TS413-2021-valid-exam-braindumps.html